▶ See the output produced by this function right away. Preview of the Company H example output
- Integrating ISO 9001, 14001 and 45001 with Integrated Management System Documentation: a representative company example
-
Integrated Management System Documentation is an AI AX function. When you upload the manuals, procedures and forms that your company has operated separately for each standard, it merges them into one integrated management system document, based only on your materials and the latest international standards in the "International Standard Revision Materials". When merging, it follows the structure shared by ISO standards (the harmonized structure, clauses 4 to 10). Only ISO or IEC certification standards that use this common structure can be integrated. Model documents of other companies and sector examples are not used.
- Color numbers per standard: A color number badge is attached to each standard in the order selected, such as 1 ISO 9001 · 2 ISO 14001 · 3 ISO 45001, so that requirements that apply to only one standard can be recognized at once in the integrated manual (the colors are kept when downloaded as Word).
- Integration register: One line is written for each document and clause of the uploaded materials. Each line shows where it went in the integrated document, the action (keep, revise, merge, delete, add), and the reason and basis, so you can compare your original materials with the integration result one by one.
- Reflecting the latest revision: If your materials are of an old edition, clauses and terms are aligned to the latest edition based on the "International Standard Revision Materials", with reference numbers attached. Standards without revision materials are marked "To be confirmed".
* All companies, documents and figures below are fictional examples for explanation.
- Integration approach for a typical company
-
Representative company model (fictional)Company H: injection molding and assembly of automotive interior parts, 120 employees, operating ISO 9001, 14001 and 45001 certifications separately for each standard. 3 manuals, 30 procedures and 8 forms (41 documents in total); because each standard had its own procedure for the same task, every revision had to be made three times.1Collect materials1 dayCollect the current manuals, procedures and forms for the three standards in one folder as DOCX (save HWP files as DOCX).
Integrated Management System Document Development2Upload and confirm standards10 minutesIf you choose "Upload an entire folder", only the text is read and placed in the fields. For each file, confirm that the standard is correct (QM quality, EM environment, SM occupational health and safety).
Integrated Management System Document Development3AI integrationA few minutesSelect ISO 9001, 14001 and 45001, and choose "Entire integrated system". You then receive the clause correspondence table, gap analysis, structure chart, integrated manual, common procedures and integration register.
Integrated Management System Document Development4Compare using the integration register1 to 2 weeksCompare the actions in the register (keep, revise, merge, delete, add) with the original documents one by one, and decide the "items to confirm" such as the approval authority and retention period.
Integrated Management System Document Development5Training and integrated operation1 to 2 monthsTrain with the integrated documents and operate them, then carry out the integrated internal audit and management review. Certification audits are arranged with the certification body of your choice.
Training Materials and Lesson PlansFor the representative company, finalizing the integrated documents takes about 3 to 4 weeks and settling the integrated operation takes about 2 to 3 months (example): 41 documents are reduced to 28 (example).
- Integration register (example: excerpt)
-
Customer material (file › clause) Mark Integrated document and location Action Reason QM-01 Quality Manual › 4.1 1 IMS-MN-01 › 4.1 Merge Clause 4.1 of the three manuals combined into one SM-01 Occupational Health and Safety Manual › 5.4 3 IMS-MN-01 › 5.4 Modified Consultation with non-managerial workers specified EP-03 Document and Record Control › 5.6 2 IMS-PR-01 › 5.3 Merge Legal requirements list made common as an externally sourced document QM-01 › Appendix: organization chart (2019) 1 — Delete Replaced with the latest organization chart (None. Added) 12 IMS-MN-01 › 4.1 Add Consideration of climate change: basis in the "International Standard Revision Materials" * The table is an example for explanation. The actual register is created with one line for each document and clause of the materials you upload, and the actions in the register match the 【Revised】 and 【Added】 marks in the body text.
Input example: Entire integrated system
Field Input Your materials to be integrated "Upload an entire folder": 3 manuals, 30 procedures and 8 forms (DOCX), standard confirmed for each file, read only within the browser and not stored Names to mask Company names and plant names (separated by commas): replaced with "Company X" before sending; emails and phone numbers are always masked Standards to integrate ISO 9001 · ISO 14001 · ISO 45001 (ISO standards applying the HS, color numbers in list order 123) Output to create Entire integrated system (correspondence table, gap analysis, document structure chart, integrated manual, common procedures) Sector and scope Injection molding and assembly of automotive interior parts, head office and Plant 1 Requests Please divide clause 8 by standard, and keep the existing document numbering system - Output preview: Company H example
-
This is the output you receive when you enter the following in eiso's Integrated Management System Documentation. Using the fictional company Company H (injection molding and assembly of automotive interior parts, 120 employees, operating ISO 9001, 14001 and 45001 separately for each standard, now integrating) as an example, it was drafted in advance in the same way as the actual function, finding the basis in AGENT's knowledge materials.
Integrated Management System DocumentationISO 9001 · 14001 · 45001 Integration: Clause Correspondence Table, Integrated Manual, Integration RegisterFictional company Company HThis is what was enteredStandards to integrate ISO 9001 · ISO 14001 · ISO 45001 (ISO standards applying the HS, color numbers 1, 2, 3 in list order) Output to create Entire integrated system (correspondence table, gap analysis, document structure chart, integrated manual, common procedures) Sector and scope Injection molding and assembly of automotive interior parts, head office and Plant 1 Requests Please divide clause 8 by standard, and keep the existing document numbering system Customer materials 3 manuals, 30 procedures and 8 forms (DOCX, uploaded as an entire folder), read only within the browser and not stored Integration scope and principles
- Standards to integrate: 1 ISO 9001 · 2 ISO 14001 · 3 ISO 45001. They are merged into one integrated management system (IMS) with the harmonized structure (clauses 4 to 10) as the framework.
- Scope: injection molding and assembly of automotive interior parts (head office and Plant 1): the scope in clause 1.2 of customer material QM-01 Quality Manual is used as is.
- Integration method: what all three standards require is written as one common sentence, and requirements that apply to only one standard are kept separate with that standard's mark (123). Clause 8 (Operation) is divided by standard (as requested).
- Document numbers: the customer's "[prefix]-[type]-[number]" system (QM, EM, SM; QP, EP, SP) is kept, and only the prefix of the integrated documents is combined as IMS (item to confirm 1).
Status of customer materials
Material Standard Type Basis edition Where used in integration QM-01 Quality Manual.docx 1 Manual ISO 9001:2015 Integrated manual, clauses 4 to 10 EM-01 Environmental Manual.docx 2 Manual ISO 14001:2015 Integrated manual, clauses 4 to 10 · 6.1.2 SM-01 Occupational Health and Safety Manual.docx 3 Manual ISO 45001:2018 Integrated manual 5.4 · 6.1.2 QP-04 Document Control Procedure.docx 1 Procedures 2015 IMS-PR-01 EP-03 Document and Record Control Procedure.docx 2 Procedures 2015 IMS-PR-01 SP-02 Document Control Procedure.docx 3 Procedures 2018 IMS-PR-01 QP-09 · EP-09 · SP-09 Internal Audit Procedure.docx 123 Procedures 2015 · 2018 IMS-PR-05 EP-07 Emergency Response Procedure · SP-06 Emergency Action Procedure.docx 23 Procedures 2015 · 2018 IMS-PR-07 Harmonized structure clause correspondence table
HS chapter and clause 1 ISO 9001 2 ISO 14001 3 ISO 45001 Customer materials Integrated document 4.1 Understanding the organization and its context 4.1 4.1 4.1 QM-01 4.1 · EM-01 4.1 · SM-01 4.1 IMS-MN-01 4.1 5.4 Consultation and participation of workers : : 5.4 SM-01 5.4 IMS-MN-01 5.4 3 6.1.2 Environmental aspects · Hazard identification : 6.1.2 6.1.2 EM-01 6.2 · SM-01 6.1 IMS-PR-03 6.3 Planning of changes 6.3 (To be confirmed) : None IMS-PR-08 7.5 Documented information 7.5 7.5 7.5 QP-04 · EP-03 · SP-02 IMS-PR-01 8.1 Operational planning and control 8.1 8.1 8.1 QM-01 8 · EM-01 8 · SM-01 8 IMS-MN-01 8.1 8.2 Emergency preparedness and response : 8.2 8.2 EP-07 · SP-06 IMS-PR-07 9.2 Internal audit 9.2 9.2 9.2 QP-09 · EP-09 · SP-09 IMS-PR-05 10.2 Nonconformity and corrective action 10.2 10.2 10.2 QP-10 · EP-10 · SP-10 IMS-PR-06 Gap analysis
Requirement Standard Status of customer materials Difference from the latest revision Action Consideration of climate change in the context of the organization 12 None The ISO 9001:2026 gap analysis [1] and the ISO 14001:2026 revision model [2] address climate change: details need to be checked against the original text 4.1 【Added】 Consultation and participation of workers 3 Partial: only the occupational health and safety committee is described No revision materials (the latest edition of ISO 45001 is to be confirmed) 5.4 【Revised】: consultation with non-managerial workers specified Planning and control of changes 12 Partial: one line in QM-01 6.3 The ISO 14001:2026 revision model adds a new change management procedure [3] IMS-PR-08 【Added】 Management of legal requirements and externally sourced documents 23 Yes. The legal requirements list is only in EP-03 Supplemented based on the legal and other requirements procedure [4] Made common as IMS-PR-01 5.3 Document approval authority Common Yes. It differs in each of the three procedures : Consolidated into one (item to confirm 2) Integrated document structure chart
No. Document name Type Common/specific Related clauses Underlying customer document IMS-MN-01 Integrated Management System Manual Manual Common 4~10 QM-01 · EM-01 · SM-01 IMS-PR-01 Documented Information Control Procedure Procedures Common 7.5 QP-04 · EP-03 · SP-02 IMS-PR-03 Environmental Aspect and Hazard Evaluation Procedure Procedures 23 6.1.2 EP-02 · SP-03 IMS-PR-05 Internal Audit Procedure Procedures Common 9.2 QP-09 · EP-09 · SP-09 IMS-PR-06 Nonconformity and Corrective Action Procedure Procedures Common 10.2 QP-10 · EP-10 · SP-10 IMS-PR-07 Emergency Preparedness and Response Procedure Procedures 23 8.2 EP-07 · SP-06 IMS-PR-08 Change Management Procedure Procedures Common 6.3 (None. Added) QP-07 Design and Development Procedure Procedures 1 8.3 QP-07 (as is) Integrated manual (draft: excerpt)
Applicable standards and identification marks
Mark Standard Field 1 ISO 9001 Quality 2 ISO 14001 Environment 3 ISO 45001 Occupational health and safety 4.1 Understanding the organization and its context
The company determines the internal and external issues related to injection molding and assembly of automotive interior parts, and reviews them again at the management review (once a year). (QM-01 4.1 · EM-01 4.1 · SM-01 4.1)
- 【Added】 The company determines whether climate change is an issue relevant to the organization [1][2]. (To be confirmed. Check against the original text)
- 2 This includes whether environmental conditions (air, water, climate, etc.) affect the organization or the organization affects them.
5.4 3 Consultation and participation of workers
- The occupational health and safety committee meets once a quarter. (SM-01 5.4)
- 【Revised】 The matters on which non-managerial workers are consulted (risk assessment, training needs, safety of subcontracted work) are determined, and consultation records are kept.
6.1.2 2 Environmental aspects · 3 Hazard identification
Follow IMS-PR-03. For injection molding machines, mold changes and paint booths, the evaluations of the two standards use the same process list. (EP-02 · SP-03)
8.1 Operational planning and control
Process control criteria are managed with the common process list (injection molding → assembly → inspection → shipment). (QM-01 8.1 · EM-01 8.1 · SM-01 8.1)
8.2 1 Requirements for products and services
Review of customer requirements, design and development (QP-07), control of external providers and shipment approval follow QM-01 8.2 to 8.7.
8.3 23 Emergency preparedness and response
Fires, hazardous substance leaks and injuries are handled in one plan, with a joint drill once a year. (IMS-PR-07)
9.2 Internal audit
The three standards are audited at one time (at least once a year, using an integrated checklist). (IMS-PR-05)
Integrated common procedure: IMS-PR-01 Documented Information Control Procedure (excerpt)
- 1 Purpose: Documented information required by the three standards is controlled by one method.
- 4 Responsibilities and authorities: 【Revised】 One approval authority per document type: the CEO for manuals, the management representative for procedures, and the head of the responsible department for forms. (QP-04 Quality Team Manager · EP-03 Environment and Safety Team Manager · SP-02 Plant Manager → to be consolidated, item to confirm 2)
- 5.3 Externally sourced documents: 【Added】 The latest editions of legal and customer requirement documents are checked once a quarter and the list is updated [4]. (The legal requirements list in EP-03 5.6 is made common)
- 6 Records and retention: The record lists are combined into one, and where retention periods differ, the longer one applies. (item to confirm 3)
Documents reduced by integration
Manuals 3 → 1, common procedures 12 → 5 (documented information, internal audit, management review, nonconformity, training), total 41 → 28 (example)
Integration register
No. Customer material (file › clause, item) Mark Summary of the customer material Integrated document and location Action Reason and basis 1 QM-01 Quality Manual › 4.1 1 Internal and external issues reviewed once a year IMS-MN-01 › 4.1 Merge Clause 4.1 of the three manuals combined into one 2 EM-01 Environmental Manual › 4.1 2 Includes environmental conditions IMS-MN-01 › 4.1 Merge Specific requirements are kept with the 2 mark 3 SM-01 Occupational Health and Safety Manual › 5.4 3 Occupational health and safety committee once a quarter IMS-MN-01 › 5.4 Modified Consultation with non-managerial workers specified 4 QP-04 Document Control Procedure › 4 Responsibilities 1 Approval: Quality Team Manager IMS-PR-01 › 4 Modified One approval authority 5 EP-03 Document and Record Control Procedure › 5.6 2 Legal requirements list updated quarterly IMS-PR-01 › 5.3 Merge Made common as an externally sourced document [4] 6 SP-02 Document Control Procedure › Attachment 3 3 Document distribution register IMS-PR-01 › Form IMS-FM-01-2 Merge Three distribution registers combined into one 7 QP-09 · EP-09 · SP-09 › Entire document 123 Audit once a year for each standard IMS-PR-05 Merge Integrated audit 8 EP-07 Emergency Response Procedure › 5.2 Emergency contact network 2 Contact order for fires and leaks IMS-PR-07 › 5.2 Maintain Content kept as is 9 QM-01 Quality Manual › Appendix: organization chart (2019) 1 Old organization chart : Delete Replaced with the latest organization chart (item to confirm 4) 10 (None. Added) 12 Consideration of climate change IMS-MN-01 › 4.1 Add Revision materials [1][2] 11 (None. Added) Common Change management IMS-PR-08 Add Revision model [3] Count by action: keep 1 · revise 2 · merge 5 · delete 1 · add 2
Items to be confirmed
- Decide whether to change the prefix of the integrated documents to IMS or to keep the existing QM, EM and SM system.
- Decide the approval authority for each document type (CEO, management representative, department head).
- Decide the retention period for records whose retention periods differ among the three procedures (training and inspection records).
- Attach the latest organization chart (not in the customer materials; to be confirmed).
- Check the climate change and change management requirements of ISO 9001:2026 and ISO 14001:2026, and the latest edition of ISO 45001, against the published original texts.
※ Draft for reference: it does not guarantee obtaining certification. Check clauses and requirements against the published text of the standard.
Management system AI transformation materials referred to
- ISO_FDIS_9001_vs_ISO_9001_2026_gap analysis, International Standard Revision Materials › ISO 9001 2026 revision (revised 2026-09-24)
- New 03 Climate Change and Biodiversity Assessment Guideline [ISO 14001], International Standard Revision Materials › ISO 14001 2026 revision (revised 2026-10-09)
- New 01 Change Management Procedure [ISO 14001], International Standard Revision Materials › ISO 14001 2026 revision (revised 2026-10-09)
- 06.02 Legal and Other Requirements Procedure [ISO 14001], International Standard Revision Materials › ISO 14001 2026 revision (revised 2026-04-25)
※ This is an example created with a fictional company, and the quality and content of the example may differ from the actual service results. Actual output varies with the input and the supporting materials. Output created by AI is a draft for reference and does not guarantee obtaining certification. The downloaded file is created inside your browser and is not sent anywhere.
- Points to prepare in advance
-
- Upload all current materials. This function is based only on your materials, so missing documents remain as "Not in customer materials. To be confirmed". If a field overflows (36,000 characters), request the standards or documents in separate parts.
- Compare one by one using the integration register. For items handled as "delete" or "revise", compare them with the original documents and check that no operational content has been lost.
- Decide the approval authority and document numbers. The approval authority, retention period and document number prefix that differed by standard must be set as one for the integrated documents to be operated.
- Forms and records are merged too. Forms that existed for each standard, such as distribution registers and checklists, must be merged into one so that records do not conflict.
- Purchase the original text and compare. Standard texts are copyrighted, so only a summary is used. AI output is a draft for reference and does not guarantee certification. Review and finalization are the responsibility of your company.