Step 5. Operational Planning and Control (8.1, Annex A)

This step is the first step of Operation (Clause 8). For each of the 10 control objectives in Annex A, it links the controls in the Statement of Applicability (SoA) to real operating criteria, owners and records, so you can see which step carries out each control.

Inputs: SoA and risk treatment plan (Step 9), AI system inventory (Step 4), risk and impact assessment results (Steps 8 and 10), your project list and contracts.

Outputs: operational plan by control objective, operating criteria per AI system, change management plan, control sheet for externally provided AI, and project register (Excel).

5 Operational Planning and Control: operate this step

First choose the standard to operate (ISO/IEC 42001, and ISO/IEC 27001 if operated together), the scope (development, supply, use) and the operation step, and enter the work and AI systems that use AI; a draft for that step is then written.
The platform pass (KRW 300,000 per year for one standard, KRW 200,000 for each additional one, excluding VAT) covers all the steps; no advance payment is taken.

Run now ↓

Enter the inputs and click "Write with AI". The output appears after the document completeness check (80 points). On-screen payment (card and simple payment) is being prepared. Before then, or if you prefer a bank transfer, click "Contact a staff member". A staff member will explain the amount and the transfer method, and will open access after confirming the deposit (eiso Pricing).

Operation track
If you choose Economic Prosperity (based on ISO 9001) or Social Value (environmental protection and social justice), you are taken to Management System Operation. Your industry is carried over, and the results of each step are passed on to one another in this browser.
Standard to operate

If you select nothing, only ISO/IEC 42001 is operated. If you also select ISO/IEC 27001, the Statement of Applicability is kept separately for each standard and the two are linked through a control mapping table (see "Standards operated together" above).

Operation mode

Shown only when two standards are selected. Integrated operation runs the two standards as one flow; independent operation writes each standard separately on its own operation platform (tab above).

Scope (AI role) *

Choose this before the operation step. You may choose more than one. The scope you choose applies to all the steps (inventory, risk assessment, SoA, approval, monitoring, change, audit) and is remembered in this browser.

Operation step *
Unit of selection

The table is grouped by this unit. For each project, department, division or process, you can see which AI is used and where that AI stands in the management cycle (selection → risk assessment → controls → approval for use → operations management register → monitoring → change and revision control).

Industry
Tasks and projects that use (or plan to use) AI
AI systems and tools
Designate the basic data on your computer: designate the folder or files for this step
When you designate the basic data accumulated on your computer for this step (AI list, evaluation results, test records, monitoring logs, current forms), eiso processes, analyzes and consolidates it. Files are read only within your browser and only the text is placed in the box below; they are not sent to the server and not stored.
Designate materials
Names to mask

DOCX, XLSX, PPTX, HWPX, PDF and TXT. Files are read only within your browser and only the text is used (not stored, not used for AI training).

Materials on your computer
Summary of context and data

May be left blank if you have designated materials on your computer.

Requests
Company Workspace Manage workspaces »
If you select a Company Workspace in 12 Monitoring in use, 13 Internal audit, 15 Management review, 16 Nonconformity and corrective action and 17 Improvement, the company's operational data (objectives and indicator register, incidents, and the internal audit, management review and corrective action registers) is attached to the AI request as figures calculated by the server and a short summary. It is the same data as in the corresponding steps of Management System Operation (15, 17, 18, 19 and 21), and it is used only for AI writing requests and not for training. In 2 AI policy, roles and responsibilities and objectives, "Include objective-setting materials" attaches past objective performance, significant risks, management review decisions and data sources (the same materials as Management System Operation 4 Objective setting). Results can be kept with that company by "Save to workspace", and are imported into objectives, indicators and action plan items in objective and performance monitoring.

* AI-generated output is a reference draft and does not guarantee certification.: AGENT eiso.co.kr

Notes

  • Nature of the outputAI-generated output is a reference draft and does not guarantee certification. On eiso, AGENT does not prepare or review the documents of a specific company (support for establishment, maintenance and training is separate from eiso: Management System Inquiries). Decisions such as risk acceptance, exclusion of controls and approval for deployment are yours to make.
  • Materials you uploadCompany logos, company names, addresses, e-mail addresses and telephone numbers may be uploaded as they are.
    Please delete or replace anything that may be personal information (personal names, personal mobile numbers, personal e-mail addresses, etc.) or a trade secret (customer information, models, data details, technical know-how, etc.) before uploading. Uploaded information is not used for AI training: it is not stored on the website, and the AI (Anthropic API) does not use received content for model training.
  • Text of the standardThe text of ISO/IEC 42001 is protected by copyright, so only explanations and summaries are provided. Please check clause and control numbers and requirements against the published text of the standard.

Related materials

5 Operational Planning and Control step guide expand
Operational data for this stepKeep the actual records in the registers of your company workspace, following the plans and forms made in this step.Statement of Applicability (SoA) RegisterAI and Information Asset Lifecycle ManagementChange Management Register

Outputs

  • Operational plan by control objectivecontrol objective (10) / control (38, applied or excluded in the SoA) / operating criteria and method / owner (position) / frequency and timing / records (evidence) / operating step or register / effectiveness indicator
  • Operating control criteria per AI system (scope of use, human oversight, data input rules) and the documented information needed to be confident the processes were carried out as planned
  • Change management plan (review and mitigation of planned and unintended changes) and control sheet for externally provided processes, products and services (external AI)

Project progress board

The board appears when the page is opened in a browser.

Register projects here. The same board appears on the pages of 8.1, 8.2, 8.3, 8.4, verification and use approval, and operational control, so you can see where each project stands from contract to close-out.

What to do in this step by scope

DevelopmentProvisionUse
Operating criteria, owners and records for each control objective of the development, training and deployment processes (A.6 life cycle, A.7 data) and management of planned changesOperating criteria for AI provided to customers, control objectives for information to customers and interested parties (A.8) and contractual relationships (A.10), and control of externally provided processesRules for using external AI (models, APIs, SaaS) (A.9), supplier management (A.10), data input rules (A.7) and management of change notices

Annex A: 10 control objectives and 38 controls

Control objective and control names are summaries (the standard's text is not reproduced). The last column shows the operating step that carries out the control. When you operate ISO/IEC 27001, this step uses the 93 controls in the four Annex A themes (organizational, people, physical, technological) and information security in project management (A.5.8).

Control objectiveControls (number and summary)Operating step that carries it out
A.2 Policies related to AIA.2.2 AI policy
A.2.3 Alignment with other organizational policies
A.2.4 Review of the AI policy
2 AI Policy, Roles and Objectives · 15 Management Review
A.3 Internal organizationA.3.2 AI roles and responsibilities
A.3.3 Reporting of concerns
1 AI Context Analysis · 6 Verification and Use Approval · 7 Operational Control · 12 Monitoring, Change and Revision Control · 16 Nonconformity and Corrective Action
A.4 Resources for AI systemsA.4.2 Resource documentation
A.4.3 Data resources
A.4.4 Tooling resources
A.4.5 System and computing resources
A.4.6 Human resources
4 AI System Inventory · 7 Operational Control · 11 Documented Information Control · 12 Monitoring, Change and Revision Control
A.5 Assessing impacts of AI systemsA.5.2 AI system impact assessment process
A.5.3 Documentation of impact assessments
A.5.4 Impact assessment on individuals or groups
A.5.5 Societal impact assessment
10 AI System Impact Assessment · 11 Documented Information Control
A.6.1 Management guidance for AI system developmentA.6.1.2 Objectives for responsible development
A.6.1.3 Processes for responsible design and development
2 AI Policy, Roles and Objectives · 3 AI System Selection · 6 Verification and Use Approval
A.6.2 AI system life cycleA.6.2.2 AI system requirements and specification
A.6.2.3 Documentation of design and development
A.6.2.4 Verification and validation (V&V)
A.6.2.5 Deployment
A.6.2.6 Operation and monitoring
A.6.2.7 Technical documentation
A.6.2.8 Event logging
6 Verification and Use Approval · 7 Operational Control · 11 Documented Information Control · 12 Monitoring, Change and Revision Control
A.7 Data for AI systemsA.7.2 Data for development and enhancement
A.7.3 Acquisition of data
A.7.4 Quality of data
A.7.5 Data provenance
A.7.6 Data preparation
4 AI System Inventory · 6 Verification and Use Approval · 7 Operational Control · 12 Monitoring, Change and Revision Control · 14 Legal Requirements Identification and Monitoring
A.8 Information for interested partiesA.8.2 System documentation and information for users
A.8.3 External reporting
A.8.4 Communication of incidents
A.8.5 Information for interested parties
1 AI Context Analysis · 7 Operational Control · 11 Documented Information Control · 12 Monitoring, Change and Revision Control · 14 Legal Requirements Identification and Monitoring · 15 Management Review · 16 Nonconformity and Corrective Action
A.9 Use of AI systemsA.9.2 Processes for responsible use
A.9.3 Objectives for responsible use
A.9.4 Intended use
2 AI Policy, Roles and Objectives · 3 AI System Selection · 6 Verification and Use Approval · 7 Operational Control · 12 Monitoring, Change and Revision Control · 15 Management Review
A.10 Third-party and customer relationshipsA.10.2 Allocation of responsibilities
A.10.3 Suppliers
A.10.4 Customers
4 AI System Inventory · 6 Verification and Use Approval · 7 Operational Control · 12 Monitoring, Change and Revision Control · 14 Legal Requirements Identification and Monitoring

How to use

  1. In Operation, choose "5 Operational Planning and Control" and select your company folder (AI Management System\05_Operational Planning and Control).
  2. If the Step 9 SoA exists, its result is taken in automatically; if not, applicability is left as "to be confirmed".
  3. Register projects in the board and choose the project to write for; Steps 8.2 and 8.3 are then written for the same project.
  4. Download the operational plan and the project register in Excel, review and approve them, and keep them as the master copy.

Related steps

Previous steps: 1 AI Context Analysis · 2 AI Policy, Roles and Objectives · 4 AI System Inventory · 9 AI Risk Treatment · 8 AI Risk Assessment · 10 AI System Impact Assessment · 14 Legal Requirements Identification and Monitoring · 12 Monitoring, Change and Revision Control · 15 Management Review · 17 Improvement · 11 Documented Information Control · The results of this step are used in: 6 Verification and Use Approval · 7 Operational Control · 8 AI Risk Assessment · 9 AI Risk Treatment · 11 Documented Information Control · 12 Monitoring, Change and Revision Control · 13 Internal Audit

Role sharing: eiso prepares the plan and the form and document changes for this step, and on your computer you set the operating criteria and owner for each control in the SoA, reflect them in internal guidelines and procedures, and keep the control records in the designated folder. Next time, select the AI Management System\05_Operational Planning and Control folder (or files) and eiso organizes, analyzes and consolidates the data. (Role sharing guide)